TM 55-8115-200-23&P
(1)
Group
Num-
ber
04
05
06
Section II. MAINTENANCE ALLOCATION CHART -Cent
(2)
Component/Assembly
GROUP, FLOOR
Wood Plank
Member, Cross
Plate, Threshold
Plate, Kick
GROUP, ROOF
Sheet, Roof
GROUP MECHANICAL LOAD
BRACING SYSTEM
Rail, Horizontal
Rail, Vertical
Beam, Assembly
*suBcoL~Ns ARE As FOLLOWS:
F - DIRECT SUPPORT;
**~DICATES ~/MH REQufREJj
B-4
(3)
Maintenance
function
Inspect
Replace
Repair
Inspect
Replace
Repair
Inspect
Replace
Repair
Inspect
Replace
Inspect
Replace
Repair
Inspect
Replace
Repair
Inspect
Replace
Repair
Inspect
Replace
Repair
7-
(4)
Maintenance Level
o
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.5
1.0
C - OPERATOR/CREW
-7
4.0
4.0
6.0
6.0
0.7
0.5
0.5
4.0
2.0
4.0
2.0
2.0
1.0
D
(5)
Tools
and
equip -
ment
O - ORGANIZATIONAL;
H - GENERAL SUPPORT; D - DEPOT
(6)
Remarks