TM 10-9925-100-12&P
CONTAINERIZED CHAPEL (CC)
MAINTENANCE ALLOCATION CHART
Table 1. MAC for CONTAINERIZED CHAPEL (CC)
(1)
(2)
(3)
(4)
(5)
(6)
Group
Component/Assembly
Maintenance
Maintenance Level
Tools &
Remarks
Number
Function
Equip.
Unit
Direct
General
Depot
Support
Support
C
O
F
H
D
00
Containerized Chapel
Inspect
0.10
(CC)
Service
0.10
Replace
0.50
01
General Cargo
A
Container
02
54k Air Conditioner
D
03
Army Space Heater (if
E
used)
04
F
used)
05
Foot Locker No.1
Inspect
0.20
Service
0.10
Replace
0.50
06
Foot Locker No.2
Inspect
0.20
Service
0.10
Replace
0.50
07
Foot Locker No.3
Inspect
0.20
Service
0.10
Replace
0.50
08
Foot Locker No.4
Inspect
0.20
Service
0.10
Replace
0.50
09
Foot Locker No.5
Inspect
0.20
Service
0.10
Replace
0.50
10
Foot Locker No.6 and 7
Inspect
0.20
Service
0.10
Replace
0.50
11
Foot Locker No.8
Inspect
0.20
Service
0.10
Replace
0.50
12
Foot Locker No.9
Inspect
0.20
Service
0.10
Replace
0.50
13
Foot Locker No.10
Inspect
0.20
Service
0.10
Replace
0.50
0017 00-1