ARMY TM 10-8340-211-13AIR FORCE TO 35E5-1-101(4) Use a ladder for height and untie liner pole sleeves (8), and ridge suspension lines (7) from ridge pole andtent ridge plates, allowing the liner (3) to fall on ground.(5)Lift center poles enough to slide liner under poles and to one side of tent, then tighten all guy lines at slips.(6)Move liner outside tent to an area where it can be folded.(7)Refer to figure 4-10 and lay liner out as flat as possible, with eave suspension lines (1, view A) rolled andon top of liner (2). Fold side (3) and end (4) walls and sidewall screens under liner, then fold triangularends of end walls over liner roof.(8)Fold ends of liner toward center (view B) with six-foot folds.(9)When liner is at six by sixteen feet, fold top and bottom ends in on center until liner measures three by sixfeet, then fold into a three by three foot package.(10) Lift three by three foot package on top of cover; then secure cover.Figure 4-10. Folding the Medium Tent Liners.h.ErectionofLinerinLargeTent. (figure 4-11) Erect a liner inside the large tent as follows:(1)Loosen all guy lines (1, view A) slightly by adjusting slips (2).4-15
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business