ARMY TM 10-8340-211-13
AIR FORCE TO 35E5-1-101
Table 2-1. Operator Preventive Maintenance Checks and Services (cont).
B - Before
D - During
A - After
W - Weekly
M - Monthly
Interval
Procedures
Item is
Item
Item to be
Check for and have repaired
Not Ready/
no.
B
D
A
W
M
Inspected
or adjusted as necessary
Available If:
2
Anchoring
a. Check that pins are in place at
Components
all required positions per ground
plan, and that all lines are
properly connected and adjusted
at the slips.
b. Replace broken wood or
Pins are damaged.
damaged metal pins.
3
Support Components
a. Inspect wood poles for cracks,
Poles are damaged
or breaks.
or have hardware
missing.
b. Inspect metal poles for bends
or missing hardware.
c. Replace defective poles.
4
Tent Fabric
a. Inspect fabric for rips, tears,
Tent fabric is torn
holes, cuts, broken or missing
or damaged.
stitching, mildew, signs of
extreme wear, or any other
defect.
b. Report all defects to unit
maintenance personnel.
5
Webbing or Seams
a. Inspect all webbing and seams
Webbing and
for broken or loose stitching.
seams are loose.
b. Mark and report all defects
noted.
6
Tie Tapes
a. Check that all tie tapes are
Tie tapes are
present, in serviceable condition.
missing or
unserviceable.
b. Check that all the tapes are
being used properly.
2-18