Figure 2-11. Attaching Screen Wall.
(h) Remove spindles of eave line poles from eave line grommets. Insert the spindles into screen tabs
and then replace spindles in grommets.
NOTE
The peak of the screen wall Is approximately 9-feet high and a ladder or other means
must be used to perform the next step (see paragraphs (6) thru (12)).
(i) Tie the front peak of screen wall to the ridge pole with screen wall tie line.
(j) Drive thirty-two 16-inch (40.600-cm) tent pins through footstops at bottom of screen wall.
(22) Tying jumper lines, adjusting hoisting lines, and ventilator screen flaps (Figures 2-9 and 2-12).
Figure 2-12. Tying Jumper Lines and Adjusting Hoisting Lines