TM 10-5411-224-14
TABLE 4-1. UNIT TROUBLESHOOTING - continued.
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
9. PERSONNEL DOOR DRIP MOLDING DAMAGED.
Step 1. Inspect personnel door drip molding.
Notify your supervisor if drip molding is damaged.
10. PERSONNEL DOOR DOES NOT OPEN OR CLOSE SMOOTHLY.
Step 1. Inspect hinges, handles and roller latch mechanism for adequate lubrication.
Lubricate as required (appendix G).
Step 2. Inspect door handle and roller latch mechanism for loose or missing hardware.
Repair or replace components as required (paragraph 4-19).
Step 3. Inspect door brace for damage or improper operation.
Repair or replace door brace (paragraph 4-20).
11. PANEL WALLS, FLOOR, OR CEILING IS DAMAGED.
Step 1. Inspect LMS interior
If any water intrusion or damage that interrupts the structural integrity is detected, notify your supervisor.
Superficial damage may be repainted in accordance with Chapter 3 paragraph 3-7, Touch-up Painting.
12. FLOOR DRAIN ASSEMBLY DOES NOT SEAL PROPERLY.
Step 1. Inspect floor drain plug and lanyard for damage.
If drain plug is damaged or missing, notify your supervisor.
If the drain tube is damaged and does not provide a good seal for the drain plug, notify your supervisor.
4-15
