TM 10-5411-200-14
T.O. 35E4-177-1
4-6. (cont)
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
8.
NO POWER AT ONE OR BOTH EXTERIOR UTILITY OUTLETS.
Step 1.
Check and reset circuit breaker CB8.
Replace defective circuit breaker (paragraph 4-7).
Step 2.
Test operation of associated exterior utility outlet and
wiring (paragraph 4-13).
a.
Replace defective
b.
Replace defective
Section III. ORGANIZATIONAL
wiring (paragraph 4-13).
outlet (paragraph 4-13).
MAINTENANCE PROCEDURES
This section contains the following maintenance procedures for the shelter.
LIST OF FUNCTIONS
Function
Function Ref.
No.
1
2
3
4
5
6
7
8
9
10
Function
(paragraph)
Circuit Breaker Panel Assembly Testing, Replacement and
Repair (Models NQOB and NQOD)
Replacement of Obsolete NQOB Circuit Breaker Panel With
New NQOD Circuit Breaker Panel
Power Entry Panel Assembly Testing, Replacement and Repair
Area Light Assembly Testing and Repair
Incandescent Light Assembly Testing, Replacement and Repair
Hinged Roof Area Ceiling Light Testing and Repair
Fixed Roof Area Ceiling Light Testing, Replacement and Repair
Receptacle Outlets Testing, Replacement, and Repair
Wall Switches Replacement
Blackout Switch Replacement, Repair, and Adjustment
Wiring Testing, Replacement, and Repair
Personnel and Right Cargo Door Replacement, Repair, and
Alignment
Left Cargo Door Replacement, Repair, and Alignment
Hinged Panel Leveling Jack Assemblies Service and Repair
Hinged Roof Panels Service, Replacement, Repair, and Alignment
Hinged Endwall Replacement and Repair
Hinged Sidewalls Replacement and Repair
Hinged Floor Panel Replacement and Repair
4-7
4-7.1
4-9
4-8
4-10
4-11
4-12
4-13
4-14
4-15
4-16
1
1
1
2
1
3
1
4
1
5
1
6
1
7
1
8
4-17
4-18
4-19
4-20
4-21
4-22
4-23
CHANGE 2
4-5
