TM 10-5411-200-14T.O. 35E4-177-12-13.CEILING LIGHTS AND UTILITY OUTLETS INSTALLATIONa.Ceiling light installation.W A R N I NGIn the event of lamp breakage, care must be taken inremoval of broken glass fragments and white phosphorousdust that may be dispersed within fixture. Inhalationof phosphorous dust could cause dangerous Injury.(1) Set circuit breaker CB6 to “off” position.(2) Remove power cord from stowage clip on ceiling.(3) Depress plunger lock in fixed roof light stowage bracket.(4) Move entire light fixture lengthwise toward power cord end todisengage light from the four captive studs in fixed roof.(5) Move light fixture into expandable section and mate with fourcaptive studs in hinged roof.(6) After ceiling light is properly seated, secure fixture bymoving until spring loaded plunger engages.(7) Plug power cord into connector,and twist one-quarter turn tolock in.(8) Repeat this procedure for each of five remaining ceilinglights.b.Cable and receptacle assembly installation.2-26
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business