TM 10-5411-200-14
T.O. 35E4-177-1
2-11. (cont)
ERECTION SEQUENCE
THE SHELTER JACKS ARE REMOVED FROM THEIR STOWED
SLIDE THE HINGED-ROOF OUTWARD WITH SOLAR BAR
LOCATION AND ATTACHED TO THE FOUR CORNERS
RAISE PARTIALLY TO PROVIDE ACCESS TO THE
OF THE MODULE.
ROOF STRUTS STOWED ON THE INSIDE OF THE
THE MODULE IS LEVELED USING THE BULLS EYE LEVELS
LOCATED NEAR THE JACKS.
HINGED ROOF
LOWER AND PIN ROOF STRUTS
REMOVE CABLE RETAINING PINS INSIDE SHELTER. DlSENGAGE
RAISE THE HINGED ROOF AND REST ON ROOF STRUT!
EXTERNAL FLOOR LOCKS AND USE LOCKING MECHANISM
SWING THE HINGED ENDWALLS OUT TO THE OPEN
TO FREE FLOOR ENGAGEMENT
POSITION
LOWER THE FLOOR TO THE EXTENT OF THE CABLE TRAVEL (1 1/2"
BELOW LEVELS)
RAISE THE HINGED SIDEWALL AND
CONNECT 2 SUPPORT BRACES.
INSTALL 2 SUPPORT JACKS.
USING THE SUPPORT JACKS, RAISE THE HINGED FLOOR AND
SlDEWALL TO MATE THE HINGED ENDWALLS. LINE UP
POSITIONING MARKS.
REMOVE THE STRUTS FROM THE UPRIGHT POSITION ALLOWING
THE HINGED ROOF TO REST ON THE HINGED SIDEWALL AND
ENDWALLS
REPEAT SEQUENCE FOR OPPOSITE SIDE.
STOW THE STRUTS ON THE HINGED ROOF. ENGAGE ALL
PANEL LATCHES TO COMPRESS THE SEALS.
L o c a t i o n o f I d e n t i f i c a t i o n a n d I n s t r u c t i o n P l a t e s
2-19