TM 10-5411-200-14T.O. 35E4-177-1Section IV.PREPARATION FOR STORAGE AND SHIPMENT4-49. PREPARATION FOR STORAGE AND SHIPMENT. The following steps describeprocedures for storing or shipping the shelter.a. Inspection. Inspect the shelter for the following:(1) Make sure all circuit breakers and switches in OFF position.(2) Hake sure circuit breaker panel door is closed.(3) Hake sure equipment container is strapped down to shelterfloor.(4) Hake sure caps are secured on power entry panel receptacles andbinding posts are tightened.(5) Make sure the stop plate in the load balancer is in the downposition and secured with the pin.(6) Hake sure allpositions.(7) Make sure the(8) Make sure theare secured.(9) Hake sure alllights and jacks are secured in their stowagefoot bolt and chain bolt are secured.receptacle outlets are stowed and the roof strutsdoors are securely closed.(10) Make sure camlock pin is engaged in hole or corner post.b. Packing.Be sure all components are clean and dry before packing.C A U T I O NUse care when transporting orprevent damage to shelter.c. Care and Storage.Store shelter insupply facility.If stored outside in humiddampness inside the shelter.storing shelter toa dry area or a designatedconditions, check quarterly for4-190CHANGE 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business