TM 10-5411-200-14T.O. 35E4-177-14-27.(cont)4.5.6.7.8.9.10.11.12.13*14.150Apply adhesive to seals (34 and 35) and mating surface.(Refer toparagraph 4-40)Position retainer strip (36) and seal cap (33) and install rivets(32 and 37).(Refer to paragraph 4-32)Position hinges (29, 30, and 31) and install screws (27 and 28).Position rod guide (26) and install rivets (25). Refer to paragraph 4-32)Position roof beam (24) and install washers (23), lockwashers (22),and bolts (21).Position scuff plate (20) and install rivets (19).(Refer to para. 4-32)Position hanger brackets (5) and install washers (18), lockwashers(17), and screws (16).Assemble push rods (14 and 15) with pins (13), washers (12), andcotter pins (11).Position and support solar bar (9) with push rods inserted in rodguides (26).Install pins (8), washers (7), and cotter pins (6).Position pillow blocks (4) on hanger brackets (5) and installwashers (3), lockwashers (2), and screws (l).Position handle (47) on top of fixed roof and install washers (46),lockwashers (45), and screws (44).4-140
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business