TM 10-5410-223-14/1
C1
8. PLACE BEAD OF FABRIC ENCLOSURE IN TRACK AT LEFT CORNER OF FOLDING
ROOF; FOLLOW THE SAME PROCEDURE AND THREAD FABRIC ENCLOSURE ONTO
FOLDING FLOOR, USING PULL STRAPS, PULL FABRIC FASTENER ACROSS TO COVER
END OF SHELTER.
NOTE: TEMPORARILY RAISE AND BLOCK FOLDING FLOOR TO AID THE INSTALLATION
OF FABRIC FASTENER.
TS 016718
Figure 4-1. Erection of shelter, multipurpose (sheet 8 of 13).
Change 1, 4-7