M1070 HET ARMOR KIT
II113400
Rev. D
a. Remove doghouse floor panel and doghouse back-wall panels as well, and retain for future use.
b. Install four doghouse inner brackets (1) (into previously drilled holes from Step 2.) and secure each with
three flat washers (2) and locknuts (3). Torque locknuts to 23 lb-ft.
NOTE
Special attention is required to obtain proper orientation of brackets. Studs on
long-side of each bracket are aligned with pre-drilled holes in all for instances
shown.
2
3
3
2
1
JUNE 2005