TB 9-2320-360-13&P-2
MAINTENANCE ALLOCATION CHART (MAC)
Table 1. MAC for the Crew Protection Kit .
(4)
(5)
(3)
(6)
(2)
(1)
MAINTENANCE LEVEL
FIELD
SUSTAINMENT
UNIT
DS
GS
DEPOT TOOLS AND
MAINTENANCE
EQUIPMENT REMARKS
COMPONENT/
GROUP
C
O
F
H
D
FUNCTION
CODE
ASSEMBLY
REF CODE
NUMBER
33
SPECIAL PURPOSE
KITS
3307
Crew Protection Kit: Install
30.0
1,2,3,4,5,6,7,8
Windshield Ballistic Inspect
0.2
A
Glass (LH or RH and
Armor)
Service
0.2
B
Install
3.0
2,6,8
Replace
2.0
2,6,8
Firewall Armor
Inspect
0.2
A
(LH or RH)
Install
2.0
5,6,7,8
Replace
2.0
5,6,7,8
Cab Side (Front)
Inspect
0.2
A
Armor (LH or RH)
Install
4.0
3,4,5,6,7,8
Replace
1.0
3,4,5,6,7,8
Door Assembly
Inspect
0.2
A
Service
0.2
B
Install
1.5
5,6,7,8
Replace
1.5
5,6,7,8
Door Handle
Inspect
0.2
A
Assembly
Replace
1.0
8
Door Latch and Lock Inspect
0.2
A
Pin
Replace
1.0
8
Door Ballistic Glass Inspect
0.2
A
and Frame Assembly
Service
0.2
B
Replace
2.0
8
Door Latch
Inspect
0.2
A
Adjustment
Service
1.0
8
Doghouse Armor
Inspect
0.2
A
Install
8.0
6,8
Replace
3.0
6,8