TB 9-2320-360-13&P-2
CENTER BLAST DEFLECTOR REPLACEMENT - CONTINUED
0032 00
INSTALLATION - CONTINUED
7.
Install electrical harness (9), three loop clamps (5), washers (8), new lockwashers (7), and bolts (6) on center blast
deflector (4).
5
4
9
6,7,8
417-114
8.
Install plate (1), four washers (3), and new locknuts (2) on center blast deflector (4). Tighten locknuts to 23 lb-ft (31
Nm).
1
4
2,3
417-113
9.
Install exhaust stack support brace (TM 9-2330-360-20).
10.
Install left side stowage box (TM 9-2320-360-20).
11.
END OF WORK PACKAGE
0032 00-5/(0032 00-6 Blank)