• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 4-1.  UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (CONT)
Section V.  UNIT TROUBLESHOOTING

TM-10-5410-229-13P Modular Command Post System (MCPS) Green NSN 5410-01-323-2454 Tan NSN 5410-01-334-7529 Manual
Page Navigation
  79    80    81    82    83  84  85    86    87    88    89  
TM 10-5410-229-13&P Table 4-1. UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) Weekly M- Monthly Q - Quarterly ITEM INTERVAL ITEM TO BE NO. W M Q INSPECTED PROCEDURE MCPS Fabric Check fabric assemblies,  including walls, liners, Assemblies (continued) floor, roof cap, gutter, and transport bags for rips, tears, missing straps, broken or missing grommets, quick disconnect fasteners and/ or separated seams.  Repair if necessary. Inspect condition of hook and pile fasteners.  Check for rips or separating seams.  Repair if necessary.  (See para 4-12.) WARNING When handling tent frame, do not grasp the frame near the frame joints.  Failure to do so can result in personnel injury to hands and fingers. 4 * Frame Check frame Assembly assembly components for damage, such as bends or missing handles.  Check detent assemblies on legs and fittings for cracks and proper operation.  Check fittings and connector on purlins for proper operation. Repair if necessary.  (See Para 4-13.) 5 * Anchoring Insure all tent pins  are Components   present and in serviceable condition.  Check tent lines for cuts and signs of mildew, excessive wear, or fraying.  Check for presence and condition of tent line slips.  Replace components if necessary. Change 2  4-7







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.