TM 9-2330-379-14&P
HYDRAULIC PUMP - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
ASSEMBLY- CONTINUED
26
Plate
Air motor
Screw air motor assembly (8) onto plate
weldment
assembly (8)
weldment (22).
(22)
27
Air motor
Tee (10) and
Attach to air motor assembly (8).
assembly (8)
valve (11)
28
V-retainer (9)
Secure V-retainer (9) with flat-tip
screwdriver.
NOTE
Ensure new connecting link pin is being
used.
29
Lever assem-
Connecting link
Secure lever assembly (4) to plunger (23)
bly (4)
pin (7)
using connecting link and pin (7).
NOTE
Ensure new clevis pin is being used.
30
Plate
Clevis pin (5)
Secure lever assembly (4) to plate
weldment
weldment using clevis pin (5).
(22)
NOTE
Ensure new cotter pin is being used.
31
Lever
Cotter pin (6)
Secure clevis pin (5) with cotter pin
Assembly
(6).
(4)
32
Pump handle (1)
Attach pump handle (1) to lever assembly
and clevis pin
(4) with clevis pin (2).
(2)
NOTE
Ensure new hairpin is being used.
33
Pump handle
Hairpin (3)
Secure clevis pin (2) with hairpin (3).
(1)
5-26