TM 10-8340-227-13&PSECTION III. OPERATION UNDER USUAL CONDITIONS2-3. ASSEMBLY AND PREPARATION FOR USE. This section provides detailed instructions for setting up the SoldierCrew Tent.2-4. UNPACKING AND INSPECTION. Unpack crates/transport bags and visually inspect their contents. Make sure thateverything is there, including end items and basic issue items, as listed in Appendix C. Also refer to Table 2-1, OperatorPMCS, for inspection procedures.2-5. ASSEMBLY AND INSTALLATION INSTRUCTIONS. To assemble the Soldier Crew Tent, proceed as follows:a. SiteSelection. When selecting a site on which to set up the Soldier Crew Tent:(1) Select a level area.(2) If possible, the area should be sheltered from high winds.(3) Clear area of all rocks and underbrush.(4) If necessary, dig a drainage ditch around the tent site.b. PitchingtheTent.2-24
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business