TM 10-8340-227-13&PTable 2.2. Operator Preventive Maintenance Checks and Services for Soldier Crew Tent - (Continued)LocationNot FullyItemItem To BeProceduresMission CapableNoIntervalCheck/ServiceIf:FrameAssy9 During Poles, Hub Assy Check that poles (1)Frame cannot beoperate properly anderected orfit securely into hubsupport tent.assembly (2).During Hardware Check that frameHardware com-joint sleeves (3),ponents damagedframe pins (4), splitor missing.rings (5), and screws(6) are not damagedor missing. Replacedamaged or missingcomponents. (Referto para 3-6.)2-11
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business