TM 10-8340-227-13&PTable 2.2. Operator Preventive Maintenance Checks and Services for Soldier Crew Tent - (Continued)LocationNot FullyItemItem To BeMission CapableNoIntervalCheck/ServiceProceduresIf:FrameAssy1 Before Poles, Hub Assy Check that poles (1) Frame cannot beoperate properly anderected orfit securely into hubsupport tent.assembly (2).Before Hardware Check that frameHardware componentsjoint sleeves (3),damaged or missingframe pins (4), splitrings (5), and screws(6) are not damagedor missing. Replacedamaged or missingcomponents. (Referto para 3-6.)2-3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business