TM 10-8340-226-13&P4-12. PREPARATION FOR STORAGE - Cont'd.exists. Items should be in mission readiness within 24 hours or within the time factors determined by thedirecting authority. Appropriate maintenance records will be kept during storage.Before placing equipment in administrative storage, current maintenance services and EquipmentServiceability Criteria (ESC) evaluations should be completed, shortcomings and deficiencies should becorrected, and all Modification Work Orders (MWOs) should be applied.Storage site selection. Inside storage is preferred for items selected for administrative storage. If insidestorage is not available, trucks, vans, conex or other containers may be used.4-13. PRESERVATION.If the FSCT components are to be stored without regular PMCS being performed,consult TM 38-230-2 for preservation requirements.4-14. PREPARATION FOR SHIPMENT. Prepare the FSCT for shipment by packing components in the tentcover assembly.4-10
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business