TM 10-8340-226-13&P
SECTION III. OPERATION UNDER USUAL CONDITIONS
2-3. ASSEMBLY AND PREPARATION FOR USE. This section provides detailed instructions for setting up the
Five Soldier Crew Tent.
2-4. UNPACKING AND INSPECTION. Unpack crates/transport bags and visually inspect their contents. Make
sure that everything is there, including end items and basic issue items, as listed in Appendix D. Also refer to
Table 2-1, Operator PMCS, for inspection procedures.
2-5. ASSEMBLY AND INSTALLATION INSTRUCTIONS. To assemble the FSCT proceed as follows:
a. Site Selection. When selecting a site on which to set up the FSCT:
(1) Select a level area.
(2) If possible, the area should be sheltered from high winds.
(3) Clear area of all rocks and underbrush.
(4) If necessary, dig a drainage ditch around the tent site.
b. Pitching the Tent.