ARMY TM 10-8340-224-13AIR FORCE TO 35E5-6-1NAVY NAVFAC-P-337.A2-15. FINAL INSTALLATION OF FLOOR AND LINER (CONT).c.Install insulated floors, if authorized as follows:(1)Unwrap and spread out floor (1) inside tent soflat and smooth.(2) Place one 8-foot section at end of tent.NOTEAfter installing first section ofinsulated floor, be sure to installadditional sections so that hookand pile fasteners mate properly.it is2-46
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business