ARMY TM 10-8340–224-13AIR FORCE TO 35E5-6-1NAVY NAVFAC-P-337.ASECTION III. OPERATION UNDER USUAL CONDITIONS2-4. ASSEMBLY AND PREPARATION FOR USE.This section providesdetailed instructions for the erection and disassembly of theTEMPER Tent.2-5. FRAME ASSEMBLY. The frame assemblies are erected in threestages: kneeling, partially-erect; erect.These stages permit theattachment of components without the aid of ladders. Both rigidand sectionalized arch assemblies are in use in the field. Afterinitial assembly, the sectionalized arch assembly does not varyin function from the rigid arch assembly.WARNINGFrame assembly hinges can pinch orcrush hands and fingers. Keep handsand fingers away from frameassembly ridges and eaves.CAUTIONDo not twist or turn framecomponents when handling. Damageto equipment may result.Clear and level ground beforeinstalling floor.Sharp objectsor depressions can damage tentfloor.NOTEErect tent from top to bottom, endsection towards opposite endsection.2-17
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business