ARMY TM 108340224-13
AIR FORCE TO 35E561
NAVY NAVFACP337.A
ALPHABETICAL INDEX (CONT)
P
Procedures, Operator
Troubleshooting, General
Instructions, 33
Q
Quality Assurance, 16
R
Raising the Frame to Partially
Erect Position, 2-11
Records, Maintenance, Forms and,
12
References, Appendix A
Repair Double BumpThrough Door
Assembly, 4-10, 5-13
Repair Fabric Assemblies, 48,
59
Repair Frame and Power Control
Assemblies, 512
Repair Frame Sections, 49, 510
Repair Light Set, Type I, 37,
515
Repair Parts, 43, 53
Repair Power Control Type III/IV,
51 4
Repair Power Distribution
Components, 411
Reporting Equipment Improvement
Recommendations (EIR), 17
S
Scope, 11
Service Upon Receipt, of
Material, 45
Shipment, Preparation for, 15,
414
Site and Shelter Requirements,
44
Special Tools, TMDE, and Support
Equipment, 42, 52
Stakes and Guy Lines, 218
Stitching, Automatic, 57
Stitching, Machine, 56
Storage, Preparation for, 15,
412
Supplies and Materials List,
Expendable/Durable, Appendix E
T
Tent Flys, Placement of, 28
Terms, List of Abbreviations and,
1-10
Test and Repair Light Set, Type
I, 515
Tools and Equipment, Common, 41,
51
Tool and Test Equipment List,
Appendix B
Troubleshooting Procedures,
Operator, General
Instructions, 3-3
Troubleshooting Procedures, Unit,
General Instructions, 46
Troubleshooting Procedures,
Direct Support, 54
U
Unit Maintenance Procedures,
General, 4-7
Unit Troubleshooting, General,
46
Unusual Conditions, Operation
Under, General, 227
V
Vents, Operation of, 224
Vestibule Assembly, 219
W
Warranty Information, 18
Welding, 5-8
Window and Door Sections, Initial
Placement of, 2-6
Windows, Operation of, 224
Index 3/(Index 4 blank)
