ARMY TM 10-8340-211-13AIR FORCE TO 35E5-1-101Table 4-2. Unit Troubleshooting.MALFUNCTIONTEST OR INSPECTIONCORRECTIVE ACTION1. STOVEPIPE OPENING DEFECTIVE.Step 1. Check for small crack in shield.Report defect to next higher level of maintenance.Step 2. Check for break, or section missing.Report defect to next higher level of maintenance.2. TENT LEAKING.Step 1. Check for worn water resistant compound.Brush or spray on new coating of compound (para. 4-19).Step 2. Check for small hole in tent.Patch using tent repair kit.Step 3. Check for large hole in tent.Report defect to next higher level of maintenance.3. TENT WILL NOT STAY TAUT.Step 1. Check for defective lines.Replace defective lines.Step 2. Check for torn eave over 2 inches or grommet pulled out.Report defect to next higher level of maintenance.Step 3. Check for missing hardware.Report defect to direct support.4-23
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business