TM 10-5411-200-14
T.O. 35E4-177-1
For Readiness
Procedures
reporting,
Check for and have re-
equipment is
Item
Interval
Item to be
paired or adjusted as
Not Ready/
No.
B
D
M
Inspected
necessary
Available if:
I
I
ELECTRICAL SYSTEM
1
l
l
l
Circuit breaker
Inspect for damage to
Circuit panel
panel assembly
door and panel
damaged
2
l
l
l
Panel wiring
Inspect for damage or
Wiring damaged
disconnection
or disconnected
3
l
l
l
Light switches
Inspect for operation
Lights not
operating
4
l
l
l
Circuit breakers
Inspect for operation,
Circuit breakers
condition, and security
not operating
5
l
l
l
Power entry
Inspect for damage to
Panel damaged
panel assembly
panel
6
l
l
l
Receptacles
Inspect for operation,
Receptacles not
condition, and security
operating
7
l
l
l
Terminals/
Inspect for operation,
Terminals/con-
Connectors
condition, and security
nectors not
operating
8
l
l
l
Area light
Inspect for operation
Light not
assembly
operating
9
l
l
l
Incandescent
Inspect for operation
Light not
light assembly
operating
10
l
l
l
Hinged roof
Inspect for operation
Lights not
area ceiling
operating
lights
11
l
l
l
Fixed roof area
Inspect for operation
Lights not
ceiling lights
operating
12
l
l
l
Receptacle
Inspect for operation
Outlets not
outlets
operating
Table 2-1.
Operators Preventive Maintenance Checks and Services
B - Before
D - During
M - Monthly
2-5
