3. DRIVE BOW SPIKE INTO GROUND. PLACE THE BOW TUBE ENDS ONTO THE BOW
SPIKES. ATTACH GUY LINES TO THE AIR LOCK ASSEMBLY. PULL GUY LINES
TAUNT AND SECURE BY DRIVING GROUND ANCHORS INTO GROUND. COMPLETE
THE SECURING OF THE AIR LOCK ASSEMBLY BY PLACING TENT PINS THROUGH
THE ANCHOR ASSEMBLIES AND DRIVE INTO GROUND.
TS 016732
Figure 4-3. Attaching and securing the air lock adapter (sheet 3 of 3 ).
pandable entrance way or as an interconnecting
the installation of the air lock assembly.
corridor with the multipurpose shelter. The following
instructions and illustrations in figure 4-4 concerns
NOTE
setting up with the expandable shelter in the event
The air lock assembly basically comes with the ex-
such a requirement should exist.
pandable shelter unit and may be used as an ex-
4-21