TM 10-5410-221-14/1
Figure 2-14. Preparation for Rain (TS 01S696)
2-23. Operation in High Winds
2-21. Operation at High Altitudes
Procedures for operation in high winds are
No special operations required.
as follows:
a Check that all air lock guy ropes, ground
2-22. Operation Below Sea Level
anchors, and tent pins are secured and that
No special operations required.
ropes are all tightened evenly.
2-20