TM 9-2330-390-14&P
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS) (Cont).
item
No.
25
Interval
Before
Location
Item To
Check/
Service
OVERALL
DOLLY SET
Suspension
Procedure
NOTE
me following Before operation
checks and services are per-
formed with dolly set coupled to
towing vehicle and airbrake sys-
tem fully pressurized (see para-
graph 2-11).
a. Check air bags (42) for condition
and inflation.
Not Fully Mission
Capable If:
a. Air bag is damaged or deflated.
b. Check shock absorbers (43) for
b. Shock absorber is damaged.
damage.
c. Check air bags (42) for even
inflation by visually checking ride
height indicator rings (44) on shock
absorbers (43). As required, use
charging assembly (Item 1, Ap-
pendix D) to add air (see para-
graph 2-22).
2-22