TM 9-2330-390-14&P
4-41.
TAILLIGHT ASSEMBLY HOUSING REPLACEMENT.
This Task Covers:
a.
Removal
b. Installation
Initial Setup:
Blackout stoplight-taillight removed (see para-
graph 4-39).
General mechanics tool kit (Item 30, Appendix G)
Taillight removed (see paragraph 4-40).
Reflectors removed (see paragraph 4-104).
Tools/Test Equipment:
Equipment Conditiions:
Materials/Parts:
Marker clearance light removed (see para-
Two locknuts
graph 4-38).
Remove two locknuts (5). flatwashers (4),
machine bolts (1), and housing (2) from bracket
(3). Discard locknuts.
Install housing (2) on bracket (3) with two machine
bolts (1), flatwashers (4), and new locknuts (5).
Follow-on Tasks:
Install taillight (see paragraph 4-40).
Install blackout stoplight-taillight (see paragraph 4-39).
Install reflectors (see paragraph 4-104).
Install marker clearance light (see paragraph 4-38).
4-74