TM 9-2330-379-14&P
FRONT WHEEL TOE-IN
This task covers:
Adjustment/Front End Adjustment (page 4-73)
INITIAL SETUP
Tools
Equipment Conditions
General mechanics tool set
Front dolly set brakes released
Pipe wrench
(page 2-3)
Toe-in bar
12-inch chains (2)
ACTION
LOCATION
ITEM
REMARKS
1
Connecting
Towbar (2),
a.
Raise towbar 30 inches off ground.
link cross
steering link
b.
Measure 78 inches (+1/8 inch) from
member (1)
(3)
front center of towbar to lube fittings
on top of steering knuckles.
4-73