ARMY TM 10-8340-224-13
AIR FORCE TO 35E5-6-1
NAVY NAVFAC-P-337.A
e.
Stake foot loops (5) to ground.
f.
Tighten guy lines (2,3) .
9.
High wind lines (6) are secured to stake (1) at the top
notch.
2-19. VESTIBULE ASSEMBLY.
When authorized, the vestibule may be
used as a passageway or as an entryway.
It may be connected to
an endwall or a roof section doorway.
Erect the vestibule as
follows for all configurations.
5\
/9
/8
a.
b.
c.
d.
e.
f.
9.
Unroll vestibule adapter
Identify and lay out guy
(1) tent door.
lines (2) .
Identify and lay out vestibule fabric (3) .
Identify, lay out and assemble vestibule frame sections
(4) .
Open tent door and place all assembled frames inside.
Identify ridge spindle grommets (5) at one end of
vestibule (3) and vestibule adapter (1) .
Align vestibule spindle grommets (6) with vestibule
adapter spindle grommet (7) .
2-51