ARMY TM 10-8340-224-13
AIR FORCE TO 35E5-6-1
NAVY NAVFAC-P-337.A
2-15. FINAL INSTALLATION OF FLOOR AND LINER (CONT).
c.
Install insulated floors, if authorized as follows:
(1)
Unwrap and spread out floor (1) inside tent so
flat and smooth.
(2) Place one 8-foot section at end of tent.
NOTE
After installing first section of
insulated floor, be sure to install
additional sections so that hook
and pile fasteners mate properly.
it is
2-46