TM 10-5411-203-13
2-5. REMOVAL PROCEDURES (CONT)
b. Removal of Complexing Kit Passageway - Type II, Class A and Class B (ISO Shelter to TEMPER) (Cont)
(4)
Remove locking pins (1) from holes on upright bar (2).
(5)
Remove upright bars (2) from header bar (3) and set aside.
(6)
Remove header bar (3) from support straps (4) on roof of connector assembly and set aside.
2-45