TM 10-5411-203-13
2-4. INSTALLATION AND PREPARATION FOR USE (CONT)
b. Installation Complexlng Kit Passageway - Type II. Class A and Class B (ISO Shelter to TEMPER) (Cont)
NOTE
The next procedure requires two persons on outside and one person on the inside
of the ISO shelter.
(2) Remove sidewall or endwall closeout panel (1) and (2) using the following steps:
(a)
Locate desired closeout panel inside ISO shelter (3).
(b)
Using wide flat-tip screwdriver, loosen 12 captive screws on closeout panel.
(c)
Remove closeout panel and store on outside of shelter (2) or other location while not in use.
(d)
For end wall installation, refer to TM 10-5411-200-14 or TM 10-5411-201-14 for disengagement of support
cables.
(3) Unpack Complexing Kit Passageway - Type II, Class A and Class B using the following steps:
(a)
Remove frame-connector assembly and exterior frame assembly from packing container.
(b)
Carefully check all parts. Report any discrepancies to your supervisor.
(c)
Lay aside exterior frame assembly header bar and upright bars
(4) Align frame assembly with ISO shelter opening.
(5)
Make sure weather barrier is on top.
2-21