TM 10-5411-201-14
T.O. 35E4-178-1
4-31.
EQUIPMENT CONTAINER REPLACEMENT AND REPAIR
This task covers:
a.
Removal
c.
Repair
b.
Cleaning, Inspection
d.
Installation
INITIAL SETUP
Special tools
Hand blind
Personnel - 2
Standard Tools
riveter, Appendix B, Item 2
General mechanics tool kit
REMOVAL
1.
Unscrew two tie-down rings (1) at the end of two strap assemblies
(2) from floor panel.
2.
Lift equipment container (3) from floor and remove from shelter.
3.
Remove rivets
4.
Remove rivets
5.
Remove rivets
6.
Remove rivets
4-33)
(4) and chest handles (5). (Refer to paragraph 4-33)
(6) and hinges (7).
(Refer to paragraph 4-33)
(8) and safety hasp (9).
(Refer to paragraph 4-33)
(10) and draw pull. catches (11). (Refer to paragraph
CLEANING, INSPECTION
1.
Clean equipment container and component surfaces.
2.
Inspect mounting surfaces for corrosion and damage.
4-152