TESTING
1.
Connect site power.
2.
Unscrew connector covers from connectors.
3.
Set all circuit breakers in ON position.
4.
Using multimeter, check for proper voltage at each receptacle pin.
5.
If Improper voltage is present, replace defective receptacles,
terminals/connectors, or panel wiring.
(Refer to paragraph 5-3)
Receptacles
10
Inside shelter, remove screws (l), lockwashers (2) and washers (3),
and carefully lift cover assembly (4) away from personnel door end
endwall panel as far as it will go.
2.
Disconnect wires (20) from receptacles (10, 11, 17, and 18) at back
of panel (5)0
NOTE
Tag all wires for reconnection.
3.
Remove screws (6), lockwashers (7), receptacle covers (8), and nuts
(9) .
4.
Remove receptacles (10 and 11) and gaskets (12) from panel (5).
5.
Remove screws (13), lockwashers (14), receptacle covers (15), nuts
(16), and washers (19).
6.
Remove receptacles (17 and 18) from panel (5).