TM 10-5411-200-14
T.O. 35E4-177-1
4-26.
(cont)
6.
Remove eight screws (14), eight
screws (15), shear plate (16)
and shims (17 and 18).
7.
Remove bolts (9), lockwashers
(10), and washers (11) securing
fixed endwall (13) to fixed floor.
8.
Support fixed endwall, cut through
adhesive sealant, and remove by
using a putty knife (or similar
tool) to break bond between endwall
and fixed roof, fixed floor, and
corner posts.
DISASSEMBLY
1.
Remove screws (1) and lockwashers
(2) and remove upper mobilizer
fittings (3).
2.
Drill out rivets (4) and remove
level pan (5).
(Refer to paragraph 4-32)
4-129