TM 10-5410-284-13&P
TM 10602A-13&P
LIGHTWEIGHT MAINTENANCE ENCLOSURE (LME)
0005 00
OPERATION UNDER USUAL CONDITIONS
0005 00-7
Upon reaching the last becket lace (1), insert the next-to-last becket lace (2) through the loop of the last
becket lace (1). Pull the next-to-last becket lace tight back toward the ridge and tie it off with a half-hitch
knot. Seal the remaining section of the hook and pile wind flap (3).
Partially roll the assembly from both sides to mid-height, just above the windows (STEP 1). Buckle and
secure. Continue rolling the assembly to the ridge so that the center grommets(1) are visible between the
rolls (2) (STEP 2).