• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREPARATION FOR MOVEMENT - Contd - TM-10-5410-229-13P_74
PREPARATION FOR MOVEMENT- Contd - TM-10-5410-229-13P_76

TM-10-5410-229-13P Modular Command Post System (MCPS) Green NSN 5410-01-323-2454 Tan NSN 5410-01-334-7529 Manual
Page Navigation
  58    59    60    61    62  63  64    65    66    67    68  
TM 10-5410-229-13&P 2-6.  PREPARATION FOR MOVEMENT - Cont’d (a) Remove steel tent pins (1) from feet (2) of the frame assemblies and store in the tent pin container. (b) Collapse the center wall frame assembly (3) legs (4) on each side of the MCPS by pulling the pull pins (5), rotating the feet (2) 90 degrees, and pushing the lower leg assembly (6) up.  Be sure the lower leg assemblies (6) lock once they are collapsed. (c) Collapse  one  side  of  the  MCPS  at  a  time  by  pulling  the  pull  pins  (7)  on  the  end  wall  assemblies  (8), rotating the feet 90 degrees, and lowering the frame assembly.    Be  sure  the  leg  assemblies  lock  once they are collapsed. (d) Remove the luminaires (9) and straps (10).  Place in light set storage container and remove from tent. WARNING When handling tent frame, do not grasp the frame near the frame joints.  Failure to do so can result in personnel injury to hands and fingers. NOTE If, at any time, a pole or leg does not rotate easily, do not force it.  Check the handles to make sure that none of the handles are locked or jammed. (e) Unlock the handles (11) on the two center legs (4) by pushing them towards the center of the MCPS. Change 2  2-49







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.