• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLY AND INSTALLATION INSTRUCTIONS - Contd - TM-10-5410-229-13P_46
ASSEMBLY AND INSTALLATION INSTRUCTIONS - Contd - TM-10-5410-229-13P_48

TM-10-5410-229-13P Modular Command Post System (MCPS) Green NSN 5410-01-323-2454 Tan NSN 5410-01-334-7529 Manual
Page Navigation
  30    31    32    33    34  35  36    37    38    39    40  
TM 10-5410-229-13&P 2-6.  ASSEMBLY AND INSTALLATION INSTRUCTIONS - Cont’d (2) Repeat this process on the other side. (3) Slide tent line slips (1) halfway along tent lines (2).  Position the tent lines at a 120 degree angle at the four corners of the roof cap (3). (4) Without adjusting the tent line slips (1), extend the tent lines (2) and drive a wooden tent pin (4) through each loop,  tilted  at  a  15  degree  angle  towards  the  tent.  This  will  assist  in  controlling  the  tent  for  the  rest  of  the assembly process if there is any wind.  These four tent lines must be attached to tent pins for the rest of the assembly process. e. Anchorinq  the Roof Cap.  To anchor the roof cap proceed as follows: 2-21







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.