• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ASSEMBLY AND INSTALLATION INSTRUCTIONS - Contd - TM-10-5410-229-13P_43
ASSEMBLY AND INSTALLATION INSTRUCTIONS - Contd - TM-10-5410-229-13P_45

TM-10-5410-229-13P Modular Command Post System (MCPS) Green NSN 5410-01-323-2454 Tan NSN 5410-01-334-7529 Manual
Page Navigation
  27    28    29    30    31  32  33    34    35    36    37  
TM 10-5410-229-13&P 2-6.  ASSEMBLY AND INSTALLATION INSTRUCTIONS - Cont’d NOTE If the connector (9) does not fit in easily, do not force it.  Pull the pin and wiggle the connector (9.) into the socket (11). (8) Connect the left hand (1) and right hand (2) purlins on the center wall frame assembly (3) to the sockets (11) on the end wall corner fittings (12) of the end wall frame assemblies (7).  Lock all four purlins in the same manner. NOTE Do not raise the legs until the roof cap fabric is installed. c. Roof Cap installation.  Install the roof cap over the frame as follows: 2-18







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.