• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
REPAIR FIELD TABLE - Contd - TM-10-5410-229-13P_115
REPAIR LIGHT SET - Contd - TM-10-5410-229-13P_117

TM-10-5410-229-13P Modular Command Post System (MCPS) Green NSN 5410-01-323-2454 Tan NSN 5410-01-334-7529 Manual
Page Navigation
  99    100    101    102    103  104  105    106    107    108    109  
TM 10-5410-229-13&P 5-10. REPAIR FIELD TABLE - Cont’d (2)   Install Brace. (a) Align new brace (2) with rivet holes in top weldment (3), and leg weldment (4). (b) Install rivets (1).  (See paragraph 5-6.b.  for rivet replacement procedures.) 5-11. TEST AND REPAIR LIGHT SET, Type II This task covers: a. Test Ballast Assembly b. Remove and Install Ballast Assembly c. Remove and Install Female Cable Assembly d. Remove and Install Male Cable Assembly e. Remove and Install Switch f. Remove and Install Fuseholder g. Remove and Install Handles, Hinges, and Latches INITIAL SETUP Tools: Tool Kit, Common Number 1 (Appendix B, Section III, Item 7) Multimeter (Appendix B, Section III, Item 4) Materials/Parts: Ballast Assembly (Appendix C, Figure 5, Item 27) Cable Assembly, Female (Appendix C, Figure 5, Item 10) Cable Assembly, Male (Appendix C, Figure 5, Item 18) Fuseholder (Appendix C, Figure 5, Item 21) Handle (Appendix C, Figure 6, Item 2) Hinge (Appendix C, Figure 6, Item 3) Latch (Appendix C, Figure 6, Item 1) Switch (Appendix C, Figure 5, Item 23) 5-8







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.