TB 9-2320-360-13&P-2
ROOF ARMOR REPLACEMENT - CONTINUED
0024 00
INSTALLATION - CONTINUED
10,11
8,9
12
7
13,14,15
16 (HIDDEN)
17
417-101
11.
Install two brackets (3), 64 washers (2), and 32 new locknuts (1) on right and left edge of roof armor (7). Tighten lock-
nuts to 23 lb-ft (31 Nm).
5,6
7
4
3
1,2
417-102
12.
Install beacon light and bracket (TM 9-2320-360-20).
END OF WORK PACKAGE
0024 00-5/(0024 00-6 Blank)