Installation Manual P/N 0257550622-00
Freightliner M915 / M916 -
(Doc No.: II113500-1 D)
Crew Protection Kit
Figure 5-18. RH Kit Installation (1 of 3).
7. Ensure that panel #213 is aligned with the B pillar.
8. Temporarily secure Bracket #962 in position as shown in Figure 5-20 using the 2 lower
fasteners. Mark the location for the upper hole on the B-pillar. Remove Bracket #962.
9. Drill a 9/16-in. hole through the B-pillar in the location marked.
10. Install fasteners and components as shown in Figure 5-20.